5th launch for Baglietto: Dopamine goes into the water

Baglietto marks its fifth launch in a few months: last weekend it marked, in fact, the launch of hull number 10250, named DOPAMINE.

The fourth example of T52 bears the signature of Francesco Paszkowski Design for the exterior, while the interior of this unit is by Studio Vafiadis.

This new T52 also features the stylistic innovations that have contributed to the remarkable success of the line. The open stern with a beach club on three levels has now become a distinctive feature of the new Baglietto course: the large swimming pool, equipped with an up/down floor, closes "retractable", allowing the deck space to be expanded when not in use. The sun deck, about 24 meters long, is unrivaled on the market of boats of similar size and volume, confirming the tradition of Baglietto displacement yachts.

Baglietto
Boat builder Baglietto specialises in the construction of new planing aluminium yachts and steel & aluminium semi-displacement mega-yachts ranging between 35 and 65 metres in length. Baglietto can currently rely on 2 production sites, in La Spezia (headquarters) and Carrara (operating site). The La Spezia headquarters extend over an area of approximately 35,000 sq. m. Over the last few years, considerable investments were made to extensively renovate the entire production site: 3 new sheds for the construction of yachts up to 65 m in length were built in La Spezia, as well as new fully-equipped quays to berth vessels of up to 70 m.

An approximately 1,200-ton travel lift - the largest in Europe - allows for the haulage and launch of up-to-65 m long yachts. The operating site in Carrara, conversely, comprises 2 areas of 5,000 sq. m each. One is used to build military crafts under the Baglietto Navy brand as well as some models of the iconic brand Betram Yachts, which joined the Baglietto Group in 2015; the second area is equipped with 4 new sheds for the construction of the DOM line and yachts up to 46 m long.

MOST POPULAR > Features

oyster

Oyster 118 - A custom project by Humphreys Yacht…

Following three years in development, construction of the all new Oyster 118, the largest Oyster...

Mangusta 104 REV: Sixth hull hits the water

Mangusta 104 REV: Sixth hull hits the water

Mangusta announces the launch of the sixth Mangusta 104 REV, the entry level of the...