Benetti: worldwide premiere at the Monaco Yacht Show 2016

bendom1

FB701 MY Domani 45m The full custom yacht in steel and aluminium, 45 meters long, is articulated on 3 decks, with 4 guest cabins on the lower deck, one VIP cabin on the upper deck and a full beam owner suite on the main deck, with a private terrace overlooking the sea.

Benetti Domani

The main salon features full-height windows that grant a 180 panoramic view. As for the external spaces, the sun deck was divided in 3 areas: a lounge/sunbathing space, an external dining area protected by a wind screen and a swimming pool/bar area. The owner played an important role in defining both the layout and the equipment.

MY Domani is equipped with 2 CAT C32 ACERT 1081kW @ 2.100 rpm for a top speed of 15 knots and a range of 4.000 n.m. @ 10.5 knots.

FB264 The steel and aluminium hull of the FB264 superyacht – whose exterior styling and naval architecture were designed entirely by Benetti – has four decks, with 63.5 meters of length overall, a beam of 10.8 meters and a displacement of 1.081 GT. The interior layout – designed by FM Architettura d’Interni – features 4 guest cabins on the lower deck, 2 VIP cabins on the main deck and an 80 sqm owner suite on the upper deck. The external salon, always on the upper deck, can be used for guests’ entertainment, formal dining area, or be reserved exclusively by the Owner.

bendom2

Benetti FB264

The sun deck is dedicated to sport and wellness, with a 4-meter swimming pool, a gym and a beauty area. FB264 is a full custom yacht, enriched by luxury fabrics and materials, with the addition of unique pieces of Italian craftsmanship.

Benetti FB264 is equipped with 2 MTU – 12V 4000 M53 1380 kW @ 1800 rpm for a top speed of 15.5 knots and a range of 4.750 n.m. @ 12 knots.

Both yachts will be displayed for the first time at the Monaco Yacht Show, held in Monaco from September 28th to October 1st.

MOST POPULAR > Features

KM Yachtbuilders at Hiswa with three yachts

KM Yachtbuilders will be taking part in the upcoming Hiswa te Water in Lelystad with...

ruya2

Outfitting of 47m Project Ruya gets under way

Heesen announces that YN 17947 Project Ruya is entering the outfitting phase and is due...